Checklist
- 50% deposit is required at time of scheduling. Balance due day of installation.
- Your representative will walk through your home to view accessibility to the spray foam location. Suggestions may be offered to ensure valuables or personal items are protected during installation. All contents must be removed out of the work area.
- Provide access to all entry locations.
- HVAC system and main water valve must be turned off during installation.
- Manufacturer recommends to not access the work area for 24 hours. After the 24 hour period you may return and put back any belongings that may have been removed.
- Complete your residential energy tax credit form. Click here to view the Information Guide and Form.